• TRM (USD/COP)COP 3,461.92 +1.37% +COP 46.82Colombia's official exchange rate (Financial Superintendence), valid Nov 21 to Nov 23
  • EuroCOP 3,804.64 +1.37% +COP 51.45Reference: TRM crossed with the European Central Bank rate of Nov 20; not the market quote
  • Mexican pesoCOP 181.56 +1.37% +COP 2.45Reference: TRM crossed with the European Central Bank rate of Nov 20; not the market quote

What the LZB signalling system is, a key piece in the deadly Toledo train crash

TechnologyInternationalEL PAÍS35 s readAI summary
Image: EL PAÍS

The Madrid-Seville high-speed line, where two trains collided this Wednesday between Mora and Orgaz and Urda (Toledo), uses the German LZB system, which continuously monitors train speed and transmits traffic instructions to the driver's cab. When the automated system fails, control becomes manual. Early hypotheses point to "human error by an Adif operator amid a failure of the main signalling system." The line is replacing LZB with the European ERTMS.

In 35 seconds

  • LZB monitors speed and sends traffic instructions to the cab; if it fails, control becomes manual.
  • Early hypotheses point to human error by an Adif operator amid a failure of the main signalling system.
  • The Madrid-Seville line, opened in April 1992, is replacing LZB with the European ERTMS system.
Read the full story at EL PAÍS

IASummary generated by artificial intelligence from a story by EL PAÍS. It may contain errors: the original source prevails.

Comments

Be respectful. Comments reported by several people are hidden until a moderator reviews them.

You do not need an account to read, only to comment. Sign in with a code sent to your email or with your Google account. We only show the name you choose, never your email.

    Keep reading