• TRM (USD/COP)COP 3,461.92 +1.37% +COP 46.82Colombia's official exchange rate (Financial Superintendence), valid Nov 21 to Nov 23
  • EuroCOP 3,804.64 +1.37% +COP 51.45Reference: TRM crossed with the European Central Bank rate of Nov 20; not the market quote
  • Mexican pesoCOP 181.56 +1.37% +COP 2.45Reference: TRM crossed with the European Central Bank rate of Nov 20; not the market quote

Bilbao manufactures the monopiles of more than 105 metres for the Hornsea 3 offshore wind farm

TechnologyInternationalXatakaAI summary
Image: Xataka

The Biscayan company Haizea Wind Group is producing at its Zierbena plant, in the port of Bilbao, steel monopiles measuring 11 metres in diameter, more than 105 metres in length and more than 2,300 tonnes in weight that will be installed at the Hornsea 3 offshore wind farm in the United Kingdom. The farm, developed by Danish company Ørsted about 120 kilometres off the coast of Norfolk, will have 2.9 GW of capacity and is scheduled to come into operation at the end of 2027.

In 45 seconds

  • Haizea Wind Group manufactures monopiles of 11 metres in diameter, more than 105 metres long and more than 2,300 tonnes at Zierbena, in the port of Bilbao
  • The components will be installed at the Hornsea 3 offshore wind farm in the United Kingdom
  • Hornsea 3, owned by Ørsted, will have 2.9 GW and is expected to operate at the end of 2027
Read the full story at Xataka

IASummary generated by artificial intelligence from a story by Xataka. It may contain errors: the original source prevails.

Comments

Be respectful. Comments reported by several people are hidden until a moderator reviews them.

You do not need an account to read, only to comment. Sign in with a code sent to your email or with your Google account. We only show the name you choose, never your email.

    Keep reading